Liberty Hospital Phase II Surgical Build-out
This remodel project included installation of new air handler, chiller, chilled water pump, and finish of shell space for two new operating rooms.
An interesting component of the project was the Single Large Diffuser (SLD) operating room ceiling system, bringing an innovative laminar air flow above the patient, which prevents contamination of biological or particle-sensitive materials.
Services Provided
-
HVAC
-
Electrical
-
Plumbing
-
Sheet Metal Construction
-
Fabrication (pipe and sheet metal)
-
Detailing/Coordination
Project Details
Liberty, MO
May 2019
GC: JE Dunn Construction
Architect: Pulse Design Group
Engineer: Henderson Engineers
Do you need a team of professional technicians to help repair or maintain your facility's systems? Get started by finding a P1 Service location near you.
Still not sure if P1 Service, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.